YMCA

YMCA

Engineered awning for the YMCA in Mililani. This job was unique because we wanted to keep it an awning which meant no posts. So we created horitzontal attachment points for our attachments. The upper headbar also stood off the wooden header because of the concrerte columns. We resolved this by a series of short “posts”…

Residence 19165

Residence 19165

Residence 19165 This project is representative of an installation in which we install a canopy to an existing roof. To do this we have to through bolts stainless brackets to stanless angle tso that the roof brackets have solid connections to roof beams. Then the canopy is bolted to those brackets.